Skip to main content
Brevard County Logo
File #: 8743   
Type: Public Hearing Status: Agenda Ready
File created: 3/19/2026 In control: Utility Services Department
On agenda: 4/7/2026 Final action:
Title: Public Hearing, re: Approval of Resolution for Adoption of State Revolving Fund (SRF) Wastewater Facility Plans for the following South Beaches Projects: (1) Deep Injection Well Improvements (District 3), (2) Wastewater Treatment Facility to Advanced Wastewater Treatment (AWT) Conversion-6 MGD Treatment Train (District 3), and (3) Riverside Drive Force Main Improvements-Riverside Drive 30-inch Parallel Force Main (Districts 4 & 5) as required by the Florida Department of Environmental Protection.
Attachments: 1. Attachment 1 Facility Plan - South Beaches Deep Injection Well Improvements.pdf, 2. Attachment 2 – Board Resolution Deep Injection Well Improvements.pdf, 3. Attachment 3 Facility Plan - South Beaches Wastewater Treatment Facility to AWT Conversion-6 MGD Treatment Train.pdf, 4. Attachment 4 – Board Resolution Wastewater Treatment Facility to AWT Conversion—6 MGD Treatment Train.pdf, 5. Attachment 5 Facility Plan - South Beaches Riverside Drive Force Main Improvements-30-inch Parallel Force Main.pdf, 6. Attachment 6 – Board Resolution Riverside Drive Force Main Improvements-Riverside 30-inch Parallel Force Main.pdf
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Subject:

Title

Public Hearing, re: Approval of Resolution for Adoption of State Revolving Fund (SRF)  Wastewater Facility Plans for the following South Beaches Projects: (1) Deep Injection Well Improvements (District 3), (2) Wastewater Treatment Facility to Advanced Wastewater Treatment (AWT) Conversion-6 MGD Treatment Train (District 3), and (3) Riverside Drive Force Main Improvements-Riverside Drive 30-inch Parallel Force Main (Districts 4 & 5) as required by the Florida Department of Environmental Protection.

End

Fiscal Impact:

The estimated capital cost to be financed by SRF for each South Beaches project is as follows:

                     Deep Injection Well Improvements - $23,911,406

                     Wastewater Treatment Facility to AWT Conversion - 6 MGD Treatment Train - $22,920,257

                     Riverside Drive Force Main Improvements - Riverside Drive 30-inch Parallel Force Main - $19,736,302

Pending SRF selection for project (s) and funding amount allocation.

Dept/Office:

Utility Services

Requested Action:

Recommendation

It is requested that the Board of County Commissioners conduct a public hearing for approval of a resolution adopting the Facility Plans for the following South Beaches Projects: (1) Deep Injection Well Improvements, (2) Wastewater Treatment Facility to AWT Conversion-6 MGD Treatment Train, and (3) Riverside Drive Force Main Improvements-Riverside Drive 30-inch Parallel Force Main.

End

Summary Explanation and Background:

The Utility Services Department has various projects underway, which are required by State and Federal law related wastewater nutrient reduction.  Although SRF typically caps its loan amount to utility departments at approximately $25M, it is an option for funding the projects, even though it may be a partial fund.  The advantage of SRF is that it is a low-interest loan through the State via the Environmental Protection Agency.  Typically, the interest rate is 2-3% less than the bond market. 

 

During the January 13, 2026, Board meeting, approval was given for the Department to apply for SRF funding for the Utility Services Projects that are outlined in this agenda item. As part of the SRF application process, the municipality is to complete a Facility Plan.  Facility Plans are required to demonstrate that the proposed project is technically sound, cost-effective, and the best solution to meet regulatory and environmental requirements.  With the approval of the Facility Plan, a resolution will be adopted. This resolution has been reviewed and approved by the County Attorney’s Office and was advertised in Florida Today on March 19, 2026.

 

Additionally, as part of the SRF process, a public hearing is required to be held to explain the proposed projects, the capital cost, the long-term financial impact on the customers, and give the public to participate in evaluating the project alternatives.

 

In addition to seeking SRF funding, the Department has been actively pursuing grant funding for these projects and has received the following funds to support these projects:

                     South Beaches Deep Injection Well Improvements - $2M FDEP grant for design

                     South Beaches Wastewater Treatment Facility to AWT Conversion - 6 MGD Treatment Train - $14M FDEP grant for design and construction

                     Riverside Drive Force Main Improvements - $1.8M ARPA for design, $14M FDEP grant for design and construction

 

Attachments:

Attachment 1 - Facility Plan - South Beaches Deep Injection Well Improvements

Attachment 2 - Board Resolution Deep Injection Well Improvements

Attachment 3 - Facility Plan - South Beaches Wastewater Treatment Facility to AWT Conversion-6 MGD Treatment Train

Attachment 4 - Board Resolution Wastewater Treatment Facility to AWT Conversion-6 MGD Treatment Train

Attachment 5 - Facility Plan - South Beaches Riverside Drive Force Main Improvements-30-inch Parallel Force Main

Attachment 6 - Board Resolution Riverside Drive Force Main Improvements-Riverside 30-inch Parallel Force Main

Clerk to the Board Instructions:

E-mail Clerk Memo to Karina Perez at: karina.perez@brevardfl.gov and mail original to Utility Services, Attention: Karina Perez.