Title: Sidewalk Waiver request to the Board of County Commissioners for design & construction of a +400 ft. section of sidewalk along the South US Highway 1 street frontage abutting the applicant’s property located at 3115 Aspinwall Ave, Rockledge, FL 32955. (26WV00008) (25SP00016) (District 4)
Attachments: 1. Application.pdf, 2. Site_Plan.pdf, 3. Location Map.pdf, 4. Pictures.pdf, 5. Sidewalk Waiver Review - SCTPO - 3115 Aspinwall Ave, Rockledge FL.pdf, 6. sidewalk-assessment-agreement.pdf
Date Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Subject:

Title

Sidewalk Waiver request to the Board of County Commissioners for design & construction of a +400 ft. section of sidewalk along the South US Highway 1 street frontage abutting the applicant’s property located at 3115 Aspinwall Ave, Rockledge, FL 32955. (26WV00008) (25SP00016) (District 4)

End

Fiscal Impact:

None

Dept/Office:

Planning and Development

Requested Action:

Recommendation

Pursuant to Brevard County Code of Ordinances Section 62-3207, the applicant, Cirrus Properties LLC, seeks the Board’s approval to waive design and installation of a sidewalk along the development’s South US Highway 1 street frontage. Granting approval to this sidewalk waiver (26WV00008) allows + 400 feet of sidewalk installation to be postponed in accordance with the attached sidewalk assessment agreement.

End

Summary Explanation and Background:

The subject property is planned for expansion of an 18,000-sf warehouse building west of the existing building that fronts on US Highway 1. The warehouse building expansion requires a site plan review, leading to code requirements to address development deficiencies, which in this case is the lack of sidewalks.

 

Sec. 62-2956(b)(2) Brevard County Code of Ordinances requires the developer “provide sidewalks adjacent to roadways abutting their project” but provides “in areas where it can be demonstrated by the applicant that there is no current or future need for sidewalks in the immediate area, the sidewalk requirement may be administratively waived, provided that a sidewalk assessment agreement is entered into by the property owner.” Although the existing structure is that closest to US Highway 1 (see attached Site Plan exhibit), along with the existing stormwater pond, because the site plan for the additional improvements encompasses the entire parcel the sidewalk requirement applies to this adjacent roadway.

 

The Space Coast Transportation Planning Organization recommended the sidewalk waiver not be granted due to pedestrian improvement recommendations outlined in the SCTPO Bike/Ped Master Plan, US 1 Corridor Study, transit stops on Wickham Rd., and existing sidewalk connectivity (the nearest sidewalk is directly to the North across Aspinwall Ave., approximately 40 feet from the subject property).

 

Brevard County Public Works Engineering stated “Public Works is not in support of waivers to sidewalks that are to be constructed by the developer.”

 

FDOT stated that the Department defers to the County or local municipality with respect to the requirements for sidewalks as they pertain to the Land Development Regulations of the permitting agency.

 

The applicant’s stated justification for granting the waiver included: The existing on-site stormwater retention pond is directly adjacent to the US1 right-of-way and cannot be relocated. The US 1 roadside swale has steep front and back slopes exceeding 2:1 in most areas. The developer would have to construct a retaining wall 7-8 ft. tall to create a sidewalk area within those drainage areas. Doing so would negatively impact the functionality of the existing on-site retention pond. The existing FDOT US 1 swale would need to be replaced by storm pipes and inlets. Constructing a sidewalk along US 1 would also require reconstruction of the Aspinwall Avenue road profile in order to provide ADA compliant slopes. There are no existing sidewalks along US 1 between the project site and bridge over the Pineda Causeway +1.7 miles away. The existing building’s finished floor elevation is over 14 ft. higher than the US 1 road surface and 17 ft. higher than the existing roadside swale.

 

After considering the application under the criteria under Section 62-3207, the Planning and Development Director, in his capacity of overseeing the Land Development Section, determined that “the intensity and location of the development warrants an evaluation by the board,” pursuant to Section 62-3207(a).

 

If the waiver is granted by the Board, the applicant would enter into the sidewalk assessment agreement with the County for the subject property that is currently under site plan review (25SP00016). In turn, construction of the sidewalk would be delayed until the County, in its’ sole discretion, determines sidewalks are necessary on the property. The County reserves its right to exercise its’ authority regarding future special assessments under Florida law and County Code in lieu of installing the sidewalk at this time.

 

It should be noted that Board approval of this waiver only applies to the sidewalk design & construction along US Highway 1 and does not relieve the developer/owner from obtaining all other necessary jurisdictional permits nor postpone the construction of other infrastructure improvements.

Clerk to the Board Instructions: