Brevard County Board of County Commissioners  
Commission Chambers, Building C  
2725 Judge Fran Jamieson Way  
Viera, FL 32940  
Minutes  
Thursday, March 19, 2026  
1:00 PM  
Budget Workshop #2  
Florida Room  
B.  
CALL TO ORDER  
Rollcall  
Commissioner District 1 Katie Delaney , Commissioner District 2  
Tom Goodson, Commissioner District 3 Kim Adkinson,  
Commissioner District 4 Rob Feltner, and Commissioner District 5  
Thad Altman  
Present:  
A.  
PLEDGE OF ALLEGIANCE: Commissioner Rob Feltner, District 4  
Commissioner Feltner led the assembly in the Pledge of Allegiance.  
The Board approved forCommissioner's Delaney and Goodson to participate via telephone.  
Result: APPROVED  
Mover: Kim Adkinson  
Seconder: Rob Feltner  
Ayes: Delaney, Goodson, Adkinson, Feltner, and Altman  
C.1. Budget Overview  
Jim Liesenfelt, County Manager, stated it is just him today doing a little on the high level, and  
keeping it a little bit informal; at the last Board meeting it was asked what staff was going to do  
in the budget workshop and he advised staff would talk facilities; the Board also asked to see  
infrastructure; he wants to point out that Facilities is infrastructure so he is going to cover a lot  
of stuff on infrastructure, some may be surprising; if he starts to talk too fast, he would ask that  
someone wave their arms so he can slow down; there is staff in the room and if there is a slide  
related to their Department they are here to answer any questions; just a couple things before  
he gets started, he would like to thank Keith Neterer, Interim Budget Director, Tad Calkins and  
Jill Hayes, Assistant County Managers, for dealing with him the last week to put everything  
together; and also the budget office and all the other Departments because he has been asking  
lots of questions to get this put together for the Board. He went on to say the topics to be talked  
about is County infrastructure and the slide shows the subjects that he will be going through;  
believe it or not, a little bit on insurance funds, some revenue options, questions, and then  
Board discussion on whatever direction it wants to go with; at the last workshop, staff talked  
about the color of money where it went through the $2.5 billion budget; when one gets down to  
it, it is about $288 million in operating funds in the General Fund; last year, to help balance the  
budget, staff went through a number of recommendations to General Fund for cuts and he  
wanted to highlight that, reductions is a better word, for what they did not fund in the budget  
that staff would have liked to have funded; there were a number of Public Works items there  
and quite a bit of Facilities management, that will be discussed; and the next slide it shows the  
Parks and Recreation items. He noted one can see the asterisk there that was one of the last  
updates because based on Board actions on Tuesday, they restored the Parks and Recreation  
through the Municipal Service Taxing Unit (MSTU), and those reductions have been restored;  
one can see a couple of the reductions; he pointed out this slide was in the Budget message, it  
is the items removed from the recommended budget before it was given to the Board so it  
could fund all the other needs and priorities it had; and he stated he does not have this in front  
of him but would point out that when looking at the cuts, the County Charter Cap is three  
percent or Consumer Price Index (CPI) or whatever is less, so when talking to Departments, if  
they have General Fund, he does not let them ask for more than three percent, therefore, when  
looking at the number of cuts, there were a number of Departments that actually received a  
little bit less in General Fund. He continued by saying IT was one, they received about $70,000  
less with network switches; there were a number of other Departments that did not even  
receive up to the full three percent; when looking at this list of items removed from the  
requested budget, that was even after he restricted the Departments in what they could ask for;  
a lot of folks took a little bit of a haircut last year to make sure they could balance the budget  
for the Board; along with the Public Works funding, there is the Detention Center; they had  
correctional impact fees; normally being spent is about $3.5 million just on various functions of  
the Detention Center, anywhere from repairs to maintenance; there were some impact fees so  
they were about to use those for this year; now there is $3.5 million reoccurring which is an  
issue that has to be addressed; the road resurfacing has kept the same amount of money as  
last year, but due to inflation in construction costs, instead of 50 miles it will go down to 40  
miles; the reconstruction went from seven and one-half to five; at the March 17 Board meeting  
what the Board did with Parks and Recreation it restored $1.5 million back into the road and  
resurfacing program; and the miles will be a little better than 40 now. He mentioned this slide is  
always shown; these are cumulative changes in the CPI since 2009; pointing out for those on  
television and Teams, the blue line is the CPI and that is what the County follows along with the  
cap; one can also see the construction costs and the general municipal cost index is higher  
than what they have been able to do; one cannot tell in the slide, but there were three years  
over three percent; the cap is CPI or three percent, whatever is lower; those couple years there  
was eight percent inflation and another year it was six percent, but the revenue was only  
increased by three percent those years; when there are a lot of bad years of inflation, the cap  
keeps it under underneath, just even the inflation rate there; this next coming budget year is  
2.63 percent; they had just gone over some budget guidelines for Departments; they probably  
do not even know what this year, but the guidelines to them will be 2.6 percent increase not the  
three percent; and nobody fell over in their chair. He stated under Facilities, he loves this chart  
and the fast facts, there is 154 buildings that facilities is taking care of; there is 2.6 million  
square feet and they are under direct management of 76 buildings and 1.8 million square feet;  
it is going to be seen from a couple Departments, showing the different infrastructures they  
maintain; the Facilities budget is 45 million and they are having a hard time, staff cannot keep  
up with the current budget, to be honest and that is just the way it is; there are the fast facts; he  
likes at the bottom, the average building was built in 1971; this building opened in February  
1991 and is 35 years old; and there are not a lot of young facilities out there and the older they  
get, the more repair one has to put together. He went on to say this slide is a list of some of the  
critical needs, Public Works was nice to divide it into different areas; he will read through it, but  
will not catch everything; in the North area there is a couple million dollars; this is beyond  
constitutional needs, he is going to highlight those, but there is the historical courthouse, the  
Brevard Room, which is a community room up there that needs HVAC, the Detention Center  
where it is estimated to have at least $6 million in repair there, four sprung structure tents which  
are the tents that are called sprung structure and they are working on replacing the fabrics with  
the Sheriff’s Office, and the Central area, the County Service Complex that is in Merritt Island,  
which the old folks call the Merritt Island courthouse; Timothy J. Mills Fire Rescue Center is a  
multi-storage building in Rockledge that houses Fire Rescue and Public Safety; the South area  
includes Viera, and one will see on the next slide about elevators and HVAC; the Moore Justice  
Center across the street are working on envelope repairs; there is work being done on  
buildings down on Sarno, and then the Melbourne Courthouse chiller and tower equipment; and  
as one can see there are a lot of immediate needs already that they are trying to find and fund  
for this next year’s budget. He continued by saying this slide has a list of major issues; he is  
learning a lot from Skip Bell, Facilities Management Manager, and Marc Bernath, Public Works  
Director, and that is why they are right here; he is going to start on the right side, the HVAC;  
last year eight projects were completed, but someone will always being working on HVAC no  
matter what; then there is the budgeted another seven different HVAC projects that are being  
worked on right now; when he says what they have budgeted, they budget what they think the  
costs are, but the costs could be different once one gets in there and start tearing apart walls,  
ceilings, and floors new stuff can be found; that is the way they budget and what they try to  
accomplish; elevators, even without Mr. Bell’s instruction, he learned about elevators and how  
they can be a pain; they had to do a major reconstruction of the elevator at the Central Cathy  
Schweinsberg Library, when that went down they had to rebuild it to meet the new Code, so all  
the elevators need to meet new Codes; there has to be new monitoring on the elevators; the  
recommended life span, and one may hear him say the word useful life which is a Federal term,  
the lifespan is 27 years and 19 of the 31 elevators are beyond that right now; one can see the  
crew has been working pretty hard over the last seven years; there are about 10 of the  
elevators that they have been able to replace, rehab, and fix up; they have budgeted for three  
of the elevators this year, so they still have at least half a dozen more to go; and that is just  
rehabbing, not if they breakdown or there might be another issue with them. He stated the  
Detention Center, at one point there was multi-year major projects and they had to take the S  
off because it was duplicate, but it does feel like multi-years, there is a lot of work to do; one  
can see there is a pretty nice overview of the Detention Center; one can see the older, existing  
building at the Center, there is a newer wing on the right, and then to look because he is going  
to talk a little bit about the pods, one can see the four green structures at the lower right-hand  
corner, those are all the different pods; over the years, staff has been working on plumbing  
chases; he has a friend who is actually an architect and plumbing is different in Detention  
Center because they can back it up, it is everything, not the standard plumbing one would find  
in a house or a building, so there is a lot of work there; of course they are always working on  
the HVAC replacement; the jail doors which one just saw at the last Board meeting was a  
couple million dollars to help finish up those, they have to refurbish the showers in there, and  
they got more HVAC fiber cable; what they added was, speaking with the Sheriff’s Office, some  
of the key points, the last expansion of the jail was 2006 and since then the population has  
grown by 25 percent; the tent structures were somewhere around 2005 with the last expansion  
there; and the capacity is still running, there is a committee that keeps an eye on it, probably  
running 80 to 90 percent. He added the thing to remember is it is almost impossible to have the  
jail at 100 percent capacity because if somebody gets sick or different things, they may not be  
able to double up in a cell, one would have to move stuff around. He noted if the capacity is  
1,500 that does not mean there can be 1,500 inmates every single day in the jail; the Sheriff  
does a really nice job working with the various County Departments that keep that number  
where it can; he put in there hundreds of work hours annually; Mr. Bell and his crew do a lot of  
work; the Sheriff’s Department is already in there doing a lot of work; and for expansion, the  
rough number for a new pod might be $40 million.  
Commissioner Feltner stated the Committee is the Public Safety Council that meets here and  
he is the Chair for that; they work collectively with all the stakeholders to keep the jailhouse  
population at a certain level; and it is a diligent thing that is always ongoing, even making sure  
that people get to State prison when they need to go because that is getting them out of the jail  
and on to State prison, something they work on a lot.  
Mr. Liesenfelt commented yes, that group has been pretty successful, Chair Altman remembers  
back when there was an add on, there was a sales tax for the Detention Center because they  
had to expand, there were suits to make sure on the capacity and that committee came out of it  
and has been a big help to keep them at the proper level of population. He advised this slides  
shows the Constitutional Offices facility needs; Mr. Calkins and himself met with the Tax  
Collector, Property Appraiser, Supervisor of Elections, and a representative from the Clerk’s  
Office last week and went through the six-story, the Brevard County Government Center North,  
or something like that, he is going to call it the six-story; they went through all the floors looking  
at what is needed to be done; if one takes a look the HVAC system, there is at least another  
$2.5 million of repairs, windows, electrical upgrades, so about $4 million in immediate needs for  
that building; there is reoccurring at the Sarno Complex of about $300,000 a year; he does not  
know how familiar anyone is with the elections office down on John Rodes, it is a pretty  
comprehensive building with a lot of functions in and out of there, with some work to do there;  
there is the East Precinct being worked on with the Sheriff’s Office and once again, just to  
repeat, the Detention Center is $4 million, but there are also a couple other costs there that are  
he called it almost non-prisoner related, but it still has to do with the facility, so there are some  
costs there; a couple pieces of good news with this is when they come back with mid-year  
adjustments in April, they are going to be able to put some funding towards the HVAC system,  
so they will be able to start cutting down on that $2.5 million dollars in need; and meeting this  
morning, he heard that there was a walk-through with the different contractors for windows and  
he had a much larger number than first thought of contractors what are interested in bidding on  
the project which will hopefully lead to much lower costs with a lot of interest for that. He  
mentioned this does not cover everything of the Constitutional needs but it provides some of  
the highlights of what staff was shown last week; the next slide is unfunded enhancements;  
they have been working throughout the County on bathroom replacements; as one can see, in  
this building the first two floors were able to be completed; they had taken the funding out for  
the third floor, and there are other buildings, buildings D and E next door that need some work,  
buildings A and B are not quite there; the restrooms are 34 years old, they spent a lot of time  
and the crew is out today working on the washrooms here and across the building; a bathroom  
is about $100,000 a pair and he has heard from somewhere else that would be about the right  
number; and he commented it is expensive to fix bathrooms nowadays. He continued by saying  
there is LVP flooring and other needs out there; they are looking, even when they do stuff  
in-house, there is about $800,000 in needs there; for flooring there is another $2 million; just in  
the Government Center, the Melbourne offices, and the Merritt Island Office they are looking at  
another $3 million of needs for Facilities; that is what one sees in Facilities; he is going to  
highlight some of the Departments because there is more than just what Facilities oversees  
directly; there is the Library system that is operating out of 18 buildings and they have that  
many branches, the main Library and 17 branches; interestingly, only 14 are owned by the  
County, some are owned by the cities and a number of libraries actually sit on city-owned land  
which is interesting how they put stuff together; one can see the Library needs, just under $12  
million; in their budget they have about $4 million funded, unfunded list is $7.4 million; the  
Libraries operate under their own Municipal Service Taxing Unit (MSTU) so they do not use  
General Fund; what he points out is they generally spend about a little over $5 million per year  
on infrastructure needs and they have $7.5 million in needs right now, showing they are a year  
behind; and it would take them a while to get caught up, assuming there are not any other  
issues that might happen to the buildings, making it more than a year and one-half of needs  
that they have out there. He went on to say Parks and Recreation, he will start off right in the  
middle of the slide, noting there are 130 parks, over 1,000 different buildings and facilities,  
anywhere from fields, lights, playgrounds, bathrooms, boat ramps, and community centers,  
they have a lot; they spend a lot of time and money on it, about average, they allocate about  
$3.2 million for infrastructure needs; that is above what they do on a daily basis for  
maintenance, repairs, and construction of new items; the unfunded list is somewhere around  
$30 million so looking at almost 10 years of needs with the Parks and Recreation; he asked  
them to put together, and one can see at the bottom, there are eight community centers,  
divided up between community, nature, and Senior centers; there are lots of infrastructure and  
then other centers and amenities; one may or may not know the County went out to the voters  
in 2000 for a referendum to build more parks and pay for more park facilities, and they had to  
go out again in 2006 to complete the funding, luckily all but one of the debt millages have been  
paid off, the last one will be this year; he will point out that these facilities that they have been  
putting together are now reaching their 25-30 year lifespan, therefore they will start requiring  
major repairs or maintenance as some things may have reached their useful lifespan; the  
County, to pay for those repairs it will have to come out of operating; when it was built, the  
County issued debt to build it, and then there was separate operating funds to operate parks;  
and now that the debt is gone, they lose that ability to bond that out, therefore any major  
repairs or replacement of these facilities are going to have to come out of their operating  
millages. He commented they also receive some General Fund; a couple minor things before  
getting into Public Works, there is some good news, and this just provides an idea of different  
departments and what is out there; Natural Resources management needs a facility to put  
together their aquatic harvesting equipment; the Extension Center has a roof replacement and  
pointing out the Extension Center says Ag Center, that really operates as a separate  
community facility where they host a lot of meetings like the famous Blue Origin meeting that  
was there; it is used by a lot of the public, it is a public need, it is more than just UF and the  
IFAS Program; Mosquito Control has been putting a lot of money together and spending a lot  
of years, as one can see their biology laboratory on the slide; they have been putting together  
the money but they are still about $800,000 short; they also have their own MSTU so it comes  
out of their own budget; and as he points out, many of these MSTUs are also operating under  
the cap, they cannot just decide to raise the MSTU by $800,000 to fund it, they have to stay  
within the Charter Cap. He noted Road and Bridge, there is a slide about their maintenance,  
drainage, and everything that is needed, but Road and Bridge also needs to make sure their  
maintenance shops are well-maintained and put together; a few years ago they put funding  
together to do a needs assessment and one can see there is over $25 million in upgrades,  
replacement fixing that they have to do of the maintenance facilities and that is just the three of  
them that one can see listed on the slide; they are working pretty hard on the Melbourne  
Central Fleet, he calls it CEP because that is what it was called when he got to the County;  
there is about $40 million in needs and $23 million of it funded; they are actively working on it  
right now, but still $17 million short; and this is to help the crews that go out and help the  
people, they go out and fix the drainage and the roadways, so they need to make sure they are  
operating in good facilities. He stated Information Technology (IT) one may not think of it as  
infrastructure but definitely to him, it is the backbone of everything that is put together; there  
has been heightened awareness of security attacks going on; he knows of one place that was  
attacked and their system was brought down, so staff always tries to keep an eye on everything  
and stay up-to-date; this last year they were able to fund their Department with existing funds;  
one can see looking at the bold parts, they are having to replace the network connectivities, the  
switches, the firewalls, and keep everything up-to-date, that is going to cost about $80,000 per  
year; when looking at the systems with all the servers and the infrastructure with the servers,  
beginning in 2029 they are looking at $350,000; all the storage, once again more equipment,  
they are looking at $400,000 per year, so basically looking at $400,000 and $500,000 per year  
of IT starting in 2027; this chart has been seen before, it was put together by Utilities; on the  
next slide there is a number of wastewater and water plants that the County has to bring online,  
upgrade to make sure the County meets all the new regulations; based on the revenue one can  
see the costs are going to exceed the existing revenue; this is a list of them all, literally from  
Mims down to the South Beaches, Port St. John, South Brevard, Sykes Creek, Port St. John or  
new regional plant; their needs are going to be over $865 million, and right now they have  
about $71 million funded and that does not mean they are not moving forward with the projects;  
they have $793 million of unfunded needs; Eddie Fontanin, Utility Services Director, his crew,  
and the County lobbyists, both Federal and State have been really good to help them with  
getting grants going through, so they will stay active with the grants; at some point they will be  
issuing debt to build some of the plants and facilities; the Board will see them coming back to  
talk about connection fee adjustments and user fee adjustments as the studies go along and  
they know what they need to do to meet the funding gap; right now analysis and studies are  
ongoing and Utilities has a deadline of 2032 to meet all these regulations; and some of this  
stuff is occurring, even without capacity needs, that staff has to make sure to have the  
upgrades. He noted Solid Waste, and he looks at them both as partners because they are kind  
of working similarly, they have to expand their capacity; the new Solid Waste facility on 192, the  
first part is funded at about $35 million and part two is still unfunded, but they will be looking at  
some kind of debt financing for that; the Titusville transfer station is currently under  
construction and it is funded with bonds and commercial paper, that is what the CP is; that  
should be completed by July which is good news for Tom Mulligan, Solid Waste Management  
Director, and his crew; cell three at the Central Disposal facilities is funded right now with some  
commercial paper, but they still have $31 million to go to complete that; to help funding sources  
for that is right there at the fund disposal assessment adjustments, debt issue, gate charges,  
impact fees, and they all have studies going on to show the costs because if they have to issue  
debt they have to justify what they need with debt; while it is not super directly connected, the  
Board will probably see in the next month or two staff talking or speaking with Waste  
Management as their contract is up next year; there is a chance for extension but one will see  
them talking about rates and collection, so that is just a heads up there; and this is his favorite  
infrastructure slide because he does not know if people think beaches are infrastructure, but  
this is Brevard County and it is extremely important to Brevard County, to the tourism, to the  
businesses, and to the residents and the County has made major commitments; one can see  
on this slide that over the years they have replaced 16 million cubic yards of sand and it costs  
the County $375 million, $31 million from Tourist Development Tax (TDT) and the rest comes  
from various grants, mostly from the Army Corp of Engineers for the funding; there is a  
commitment or a plan with the Army Corp for 50 years and as one can see the County is going  
to spend $600 million over the next 43 years, and when showing that slide to him wife she told  
him he better live to see the end of that, which would make him 101, and he hopes to see the  
end of that contract; the other on is across the street the United States Specialty Sports  
Association (USSSA) facility that the County owns; it used to be Spring training site, the County  
worked out a really nice arrangement with USSSA where they rent it from the County and as  
part of the contract they put in $250,000 of their own funding into the capital fund, and for the  
first five years of the agreement the County also put in funding, but the County is now past that  
five years, and the capital fund has a little over $3 million in it; and USSSA spends about  
$350,000 per year out of the fund, but a side note, they have to run those approvals through  
tourism, they do not get to just that fund as they see fit, they work with the County, get approval  
through the County, and make sure they spend the funds. He pointed out there are 15 fields  
that require turf replacement and that could start beginning in about two years; the fields are  
getting that old, the first ones were coming in in 2016 or 2017, somewhere in that neck of the  
woods; that is about $10 million; as one can see $250,000 a year from USSSA does not cover  
it; he will have to talk with Tourism and ask to sit down with USSSA on how to address that  
need; there is also the turf at Viera Regional that was paid through TDT and a $5 million  
project; they are probably about six years in so at some point that is becoming due for the  
parks too; and he did not highlight everything, he did not want to torture every Director, but  
there is other important infrastructure out there that he did not highlight such as Valkaria  
Airport. He noted Adam Hied, Valkaria Airport Manager, does a nice job with getting grants, a  
lot of this funded through Department of Transportation (DOT) and the Federal Aviation  
Administration (FAA); Mosquito Control has their own MSTU but they have a lot of  
infrastructure between vehicles, airplanes, drones, buildings, and labs; they put a lot together;  
another good example is Transit Services whose capital needs survive on grants, and they are  
100 percent Federally-funded so they have needs that they cannot meet with their grants, but  
there is quite a bit of infrastructure out there; and he wants to make sure to bring back, and Mr.  
Bernath did a wonderful job explaining, the Board wanted to know what needs to be done about  
improving the drainage infrastructure, and this is the same slide that the Board saw before  
showing the impacts of what would be needed to have additional drainage crews to get the  
frequency down between two and three years to one and two years. He commented if the  
Board wants to double the support staff and the drainage crew again cleaning each ditch a  
year; there are a number of other projects in the slide that will help and included is the funding  
impact that goes along with it; the last Department he is going to speak about is Employee  
Benefits and Risk Management; it is not infrastructure, but at some point he needs to highlight  
this to the Board; the top chart is the fund balance for employee benefits, health and pharmacy;  
the claims cost run about $70 million this past year, it has gone up; the last few years it has  
been $60 - $65 million; as part of the budget the rate adjustment is six percent on the  
employer side and as the employer they gain about $15,000 a year per employee for health  
insurance; the bottom chart is Risk Management, the auto liability, property insurance, general  
liability, and workers comp; the claims last year were a little over $8.5 million; as one can see  
the County is down to $4 million and is being drained quicker than he wants to see; they are  
down to maybe a couple years before having an issue with the balance forward; one can see  
the rates are going to go up between eight and 12 percent; he is pointing this out for both areas  
because it is a budgetary need and a budgetary impact to everybody, the Constitutional officers  
that may be in it, and there are a couple other outside organizations that joined with them; the  
County will be looking in 2027 and going out for procurement on the health benefits side; they  
do annual renewals every year on Risk Management; more wonderful news, the legislature  
passed to increase the sovereign immunity limits, it has been $200 and $300 forever probably  
and they passed the bill to $350 and $500, but it has not been signed by the governor; and  
Melissa Powers, Human Resources Director, just preliminary is thinking that may raise the risk  
costs by about 20 percent, she does not know for sure yet, but will see when it comes with the  
renewal, and it will have an impact. He mentioned it will be a multi-year, but he wants to look at  
a change in how the County charges out, whether it is Department-wise, employee-wise,  
vehicle-wise, so there will be a more in-depth look at that because staff has to do something  
before it comes to the Board with some direction, to make sure it can kind of level off the fund  
balance in these two items; a little good news, Florida has its own Department of Governmental  
Efficiency (DOGE) office and they put together a report, this is from page 15 of the report and  
he read, “To their credit, Brevard County leaders lowered the Countywide millage rate  
supporting Board of County Commissioners agencies each year during this period, over 20  
percent in total”; taking a look at that chart, one can see how they have been going down  
some; one other County has gone down every year which is Pinellas County; other ones have  
kept their millage rate stable, down a little bit, one actually went up, Broward County, but  
looking at the chart going back to Fiscal Year 2021, Brevard County’s Fiscal Year 2021 millage  
rate, the highest, is actually lower than any of the other nine counties lowest rate; and that is  
Commissioner direction, staff working to keep the budget balanced, and also a lot of effects of  
the cap in that. He stated this slide has been seen a number of times before, it was in the  
budget message, it was talked about at last year’s workshop, and it was talked about at the last  
workshop; there are different ways to generate some revenue; public service tax is up to 10  
percent on various utility bills, staff does not implement any of it, every municipality implements  
it in some form; that could generate somewhere in the neighborhood of $30 million; under the  
Charter, that requires even if the Board decides to do it 5:0 it requires it to go out to the ballot,  
the voters have to vote on it, it cannot just be implemented; the fuel tax that the Board talked  
about a couple meetings ago could generate about $9 million super-majority vote, or the Board  
could put it on the ballot referendum, but the $9 million only gets the transportation related  
expenditures that were highlighted throughout this report; the discretionary surtax the local  
government infrastructure, right now is a half penny, there is a half-cent for Save Our Indian  
River Lagoon (SOIRL), the Charter Regional Transportation tax is also what they call a  
discretionary sales surtax and that will get transportation related expenditures similar to the gas  
tax; and last but not least is the finding the critical need to exceed the Charter Cap limitations.  
He advised under the Charter Cap as he said earlier, the Board can only increase the revenue  
for millages by three percent or what the CPI is; if the Board goes above that, and it has done it  
twice before, it takes a super-majority vote of the Board of County Commissioners, put out a  
resolution describing what it is doing, the cost, and the reasoning behind it; that is also a way to  
help raise some revenue to meet some infrastructure needs; those have all been shown to the  
Board before in the budget message, in last year’s budget, and in the workshops; as he went  
around in the briefings, he said he would give a high level overview, provide some numbers,  
and basically get out of the Boards way for discussion; and staff is there to answer any  
questions if there is anything specific on some of the numbers, and then they will do their best  
to follow whatever direction or information the Board provides.  
Budget Overview  
Commissioner Feltner stated Mr. Liesenfelt said three percent or the CPI, it is the lesser of the  
two so everyone agreed it is the 2.63; and he asked if that is correct.  
Mr. Liesenfelt thanked Commissioner Feltner for correcting him and replied yes, this coming  
year’s cap is 2.63 percent.  
Chair Altman stated it is not spelled out in the Agenda but he assumes it is part of the Agenda;  
and he asked if there are any questions from the Commissioners or is it good to hear the  
public, then questions from the Commissioners.  
Mr. Liesenfelt stated to treat it like an Agenda Item that would be the way to go.  
D.  
PUBLIC COMMENTS  
Lisa Cullen, Brevard County Tax Collector, stated she would like to thank the Board for having  
discussion about Facilities today; Mr. Liesenfelt and Mr. Calkins came to visit the Government  
Center in North Brevard and she is there to speak for the inhabitants of that building; this year  
has been pretty bad in there, there is no heat; there were days it was hovering around 60  
degrees in her office, she is on the sixth floor; it just got colder as one went down because heat  
rises; it usually stays around 53 degrees on the bottom floor in the Clerk’s Office; yes, it is cold,  
they work with gloves and she just does not know how they do it; the HVAC in that building is  
as Mr. Bell would say, way beyond its useful life; and the chillers that serve the building are no  
longer operational, so there are portable chillers setting outside of the building that thank  
goodness are no longer powered by diesel generators, which was another fiasco within itself.  
She continued by saying the building’s windows are not sealed, therefore the cold and any  
fumes come right through the building in every regard; rain is a constant visitor through the  
windows, as are wasps; on the first and second floor there is a rat problem; she has not  
experienced rats and does not believe anyone above the third floor has experienced rats; this  
building is in serious need of some attention; it is getting to where it is almost inhabitable; and  
on many of the air conditioning vents one can see some type of black mold, or a black  
substance that is coming through the vents, therefore, the HVAC has got to be addressed. She  
added it has been passed over year-over-year; she would say if it was inspected, the building  
just needs to be torn down and something else happen; and if the Board has any questions,  
there are several hundred employees there and they need a better place to work.  
E.  
BOARD DISCUSSION  
Chair Altman stated he is looking forward to his tour; he is going to go up and take a look at it;  
obviously, it is something the Board values, it is the County’s Seat, Titusville; the Board  
definitely wants to take care of that; that was the only card; and he thanked Ms. Cullen for  
sharing that. He noted he has questions and does not know if the rest of the Board has any, so  
he will start; staff has done an excellent job in presenting to the Board; the data is very concise,  
clear, and communicated extremely well in a very straightforward and simple way; on slide 19  
the Utility Services Department infrastructure needs, he noticed Countywide there is big ticket  
of $793 million shortfall; and he is curious of what is going to be the impact of that shortfall. He  
asked if the County will be facing moratorium if it does not meet that unfunded need; does it  
mean there will be no building permits because they cannot get sewer permits; he commented  
he knows the County is facing moratorium and a big part of the campaign on septic; and he  
asked what is the impact of that.  
Eddie Fontanin, Utility Services Director, stated it would be a consent order from the State of  
Florida.  
Chair Altman asked that Mr. Fontanin explain that.  
Mr. Fontanin noted probably the County Attorney could explain it more from the legality side,  
but a consent order is from the State of Florida Department of Environmental Protection  
through their legal department notifying the County that it is not abiding with State Law; the  
projects associated on that list, the majority, if not all, are associated with the Florida Statutes;  
nutrient removal, as those conversations are had, and all of the laws related to water and  
wastewater are in Chapter 403; going under Chapter 403.064 or 403.085, as he says this as a  
Director it is just ingrained and there are subsequent laws coming, it is a notification basically  
that within those laws it provides a deadline of when the goal has to be achieved; if the County  
does not achieve it, legally it is not following the law which would then result in a consent order.  
Chair Altman commented this does not mean if the County has an unfunded need, whatever  
that may be, capacity in a plant, and he asked if that means the County does not have the  
ability to treat the sewage.  
Mr. Fontanin stated what has occurred in Florida on the wastewater side is, about 2020-2021  
Florida started enacting a bunch of laws increasing the standard of disposal treatment; to go  
back prior one hears the buzzwords of ‘nutrient reduction’ and that requires advanced  
wastewater treatment; it is the expectation, not only the State of Florida, but that the  
Environmental Protection Agency (EPA) expects; all of that has a cost association; if one thinks  
of how the, not to put it in such a way, but the business model of what Utility Services are, it is  
very different from most other utilities, even from a Brevard County geographic; when thinking  
of Cocoa, it is one continuous area that Cocoa oversees, when thinking of Melbourne it is the  
same model, when thinking of Brevard County Utility Services, it is essentially six independent  
utility services, none of which it has the ability to interconnect; and in the magnitude of how the  
logistics are set up, they really do not have the benefit of scales of economics, so to speak. He  
noted what is done for one has to be done for another; the issue then becomes, if looking at  
them individually, some of the areas from a payback period, from what would be generated in  
that area, would be a lengthy amount of time, so it is constantly doing a fund shifting; and now  
with the intensity of these State Laws, and not to forget what really through this into a wrench  
was 2022-2023, he knows there was the graph showing the construction index, but that really  
through in a wrench in it, for example, the norm for a typical lift station project used to be about  
$1-$1.2 million and now those same projects are $2.4 million; and when he talks with other  
utility directors, 30 years of doing this, the data points of what he used to think would be the  
price of a project have been thrown out because they are constantly moving higher and higher.  
Chair Altman commented what he hears Mr. Fontanin saying, this is real interesting, this is not  
necessarily just quantitative treatment, but these costs are probably qualitative treatment, that  
the County meet standards that are based by State Law, which he assumes a lot of those State  
Laws were mandated by Federal law, as well…  
Mr. Fontanin replied affirmatively.  
Chair Altman continued by saying he still has to defend the State a little bit; and it was probably  
many of the nutrient reduction requirements of Federal Law as well.  
Mr. Fontanin responded by saying absolutely, but when going through the exercise of achieving  
the goals of whether it is water or wastewater quality, it has to be looked at from the sense of  
what service area is the County expected to provide; he understands they may not be coming  
today, but as a utility one has to be three to five years ahead of it because if thinking in the  
world of development, they move much quicker than the government; and again, it is  
quantitative and qualitative.  
Chair Altman asked if any of these standards are imminent and if the County is facing any  
immediate consent orders; he noted the County is already facing a septic moratorium; and he  
inquired what the County is looking at from a time frame when it has to suddenly find itself...  
Mr. Fontanin noted the closest ones right now are going to be the water treatment plants; this is  
related to the Per- and Polyfluoroalkyl Substances (PFAS) rule; right now, the EPA has set a  
threshold of 2029, however, there is conversation at a Federal level of expanding that to 2031;  
the other ones in relation to the wastewater quality, he believes it is either 2032 or 2034 are the  
thresholds for that; as they are speaking about this conversation now, there are still additional  
bills being provided; right now, it is one of those things and Commissioner Altman spent a lot of  
time in Tallahassee, he knows when seeing the same common bill being floated year after  
year, it might not pass the first year, or the third, but maybe the fifth or the seventh, it will get  
through; and what is alarming to Utility Directors is they are seeing those bills that have been  
floated for four or five years straight, and in conversations, it will occur. He went on to say that  
would be an additional cost on top of what is presented.  
Chair Altman stated he knows in Tallahassee as he has been there, the people run a victory lap  
which is good; they have increased the standard, the nutrient standards to clean up Florida’s  
waterways, which is also good, but it is not providing the funding or having utility hearings or  
the rate payer hearings, so there has got to be a follow-up; people have to step up and fund  
those; there seems to be a lot of public support; and he asked if there is an immediate need to  
start looking at rate adjustments to meet the standards.  
Mr. Fontanin answered by saying absolutely, it is already in the works; he mentioned upon  
conclusion of this, and he has consulted with both Mr. Liesenfelt and Mr. Calkins, they have  
already completed the connection fee; the connections fees from this Department go back from  
1993 and have been unadjusted; currently, he has a rate consultant going through the financial  
model with recommendations on, not to be presumptuous, but if the connection fees were to be  
placed, and he showed that graph, there is still a delta there; there is not a project in the CIP  
that he would say the County should be doing; these are what they must be doing; and the  
‘shoulds’ have been removed about two years ago.  
Chair Altman stated there is a lot of public support for cleanup of the Lagoon.  
Commissioner Delaney stated she was wondering while on this topic, if these are things that  
could be paid for by the infrastructure sales tax and what that would look like; and she  
explained when she last spoke with the County Attorney, Morris Richardson, the County could  
still possibly have some time to update the language to include some of this stuff.  
Chair Altman asked if Attorney Richardson would like to comment.  
Attorney Richardson stated he believes the question is if the Board revisited its decision to  
renew the SOIRL half-cent surtax, and instead make it a full penny with provisions for  
infrastructure, could funds generated by that be spent on these projects; and the answer to that  
would be yes.  
Commissioner Delaney stated or to even keep it at a half-cent and just expand the allowable  
uses.  
Attorney Richardson replied potentially, yes, but even though it would still be a half-cent, it  
would be equivalent of implementing a new surtax.  
Chair Altman stated he is looking at the half-cent and it generated in the last five years about  
$500 million, he is looking at $793 million, so it would not fund it, and that is if every penny of it  
was used on it; and that would mean none of that money would be going toward cleaning up  
the Lagoon, it would be providing sewer treatment.  
Commissioner Feltner stated say the County did the half-cent and expand it in that last  
scenario, he asked if half of the funds generated there would also go to the municipal  
government, so it does not just stay in Brevard County.  
Attorney Richardson stated that is correct, either by formula or…  
Commissioner Feltner interjected by saying interlocal agreements.  
Attorney Richardson continued by saying or it being allocated through interlocal agreements,  
but yes, it would not be exclusively to the County; and if the County sort of revised the existing  
half-cent to expand the uses, it would absolutely be in a position of renegotiating those  
agreements with the municipalities.  
Mr. Fontanin noted to add because he was mentioning about State funding, at the next Board  
meeting, the Commission will be seeing that staff is submitting for State-revolving fund; the  
State-revolving fund is a great program that started in the early 80s and is associated with  
water/wastewater; however, due to the demand the rules have changed; what the rules  
changed, it used to be they could submit for multiple projects, now that has been scaled back  
and what they have done is scaled it back to where one can submit on multiple projects, but as  
an entity, the maximum they can receive is $25 million; and that is pending what their  
Committee decides. He noted the County will be leveraging that because it is a lower interest  
rate; they always submit every opportunity that Florida Department of Environmental Protection  
(FDEP) has, and they have been in communication with the lobbyist on the State and Federal  
level to try to see how to leverage it; as people know, they are doing the effort as it is related to  
the Space industry, and want to make sure they are leveraging Federal dollars and not County  
dollars on the infrastructure for that; and staff is definitely trying to stay as aware as it can to  
stretch the dollars as far as it can.  
Commissioner Feltner stated the County is not alone in bringing the wastewater up to the new  
standards; and he asked how other municipal governments are tackling that.  
Mr. Fontanin advised they have an advantage because, and he feels quite comfortable in that  
question, because for 10 years prior to being a Utility Director, he was an engineering  
consultant as a VP doing water/wastewater with a variety; the logistics of these utilities are they  
were able to capitalize on a treatment plant; there one has the ability to get the scales of  
economics in terms of keeping the price down; as this County functions, it is essentially six  
independents; if one thinks about the nutrient removal, Brevard County has six wastewater  
plants; advantage of whether it is a Cocoa, Melbourne, or Cocoa Beach, they are pumping  
there assets all into one asset, and this County has to do that times six; and it is not just the  
nutrient removal, now it is in to the disposal, especially if one is in the Indian River Lagoon  
(IRL). He went on to say disposal methods is traditionally a deep injection well; going back  
eight years, if one would have asked him what a deep injection well cost, it used to be $6 to $8  
million was the swag number, today they are getting into numbers of $25 and $30 million; the  
State has now said that every five years, there has to be a test done on that well and the  
testing period is about a five-day period; the State used to allow a period of time where they  
would allow someone to discharge to the IRL during the testing period for the benefit of testing  
the well; and come 2032, that is no longer allowed, now that requires a second deep injection  
well at a cost of $25 - $30 million so that there is the benefit of when testing one well, it  
transfers over so nothing is getting discharged into the Lagoon. He added these are the  
challenges that Utility Services has, it does not allow reuse to be a primary disposal, that is  
considered a secondary; and the reason being is because staff has no control of the  
homeowners shutting off their irrigation pumps. He mentioned right now, today, the County is  
producing more reuse than demand; if one can imagine, there is the wetlands that are familiar;  
by permit, that is the primary disposal because the County controls it; and Department of  
Environmental Protection (DEP) does not provide an option, if one decides to go full reuse,  
there does not need to be a deep injection well, that is not considered an option.  
Commissioner Feltner stated that is interesting on the demand situation because people know  
when it gets dry here that there is pretty heavy demand on reuse in at least this part of the  
County.  
Mr. Fontanin stated it is cooler weather right now but he can guarantee in about a month or  
two, it will be flipped.  
Commissioner Feltner added when it rains more.  
Chair Altman asked what the Board is looking at to fix this problem as it sees the gross amount,  
the number; what are they looking at as far as potential rates and adjustment of rates; and is it  
significant.  
Mr. Fontanin replied for connection fees right now, just to provide a sneak preview, the sanitary  
or the sewer connection rates would double.  
Chair Altman asked what the rates are.  
Mr. Fontanin stated if this is pop quiz, he hopes he scores a passing grade, and it is  
$2,300/$2,400 and he thinks it will go up to $4,800; the water, because there is less water, but  
it is a calculation; he would be thrilled to discuss this one-on-one on how the calculation was  
formed; and it is going from $1,700 to, he believes, $5,000 per ERC.  
Chair Altman asked what are the monthly rates.  
Mr. Fontanin advised monthly rates are still being worked on.  
Chair Altman commented so staff does not have those numbers yet.  
Mr. Fontanin noted he anticipates in the next two to three months they will.  
Chair Altman noted he assumes there are a lot of rate payers using Brevard County sewer in  
cities, this is not a jurisdictional thing, especially with the cities doing the large annexations,  
therefore it is not a County City thing; of a lot of the rate payers are in the cities; and he asked if  
that is correct.  
Mr. Fontanin explained when talking about rate payers in incorporated, the beaches come to  
mind; this is where there is Satellite Beach, Indian Harbour, and whatnot; the only areas, what  
staff calls South/Central that they reside in, Palm Shores, but the rest is really the Suntree and  
Viera area; they do Merritt Island and Port St. John, so those are really unincorporated; and  
then there is North Brevard.  
Chair Altman asked if in two or three months there will be more news.  
Mr. Fontanin responded affirmatively.  
Chair Altman stated as far as the consent order, are any of those imminent in the next year or  
two; and he noted that may be a question for the County Attorney.  
Mr. Fontanin stated not yet.  
Chair Altman commented there is still a window.  
Mr. Fontanin reiterated there is still a window.  
Chair Altman stated Mr. Fontanin mentioned that window is still about a three-year period and  
the Board needs to start thinking about it.  
Mr. Fontanin commented for the most part, most of those projects, if not all, are already in  
motion; staff has already gone through the Request for Qualification (RFQ) portion, there is a  
consultant, and they are working through the design; the benefit of that is because whether it is  
Federal or State, even when one does come for an opportunity for a grant, they will typically  
ask what stage of the project it is in; it is critical to get these projects at least, if not more than,  
90 percent complete because that seems to be the threshold that they are looking for, for the  
County to be seriously considered; therefore, as they are trimming out these projects, and even  
though they may be in a situation today to be asked why they are designing it when they do not  
have the money to construct it, they still need to in order to be viable to get those grants when  
they become available.  
Chair Altman commented it makes sense. He stated he will give a little history; when he was  
first elected in 1984 to the County Commission, a prior Commission in the late 70s, early 80s,  
were facing a consent order for a Federal Mandate; there was a direct discharge into the IRL,  
as part of the Federal Clean Water Act; a lot of those plants that they had were not County  
plants; with the growth in the 60s and 70s and the space programs, they allowed developers to  
come and develop these package treatment plants; there were all kinds of package plants that  
were just not working as the developers did not put capital reserve there; the County had to  
inherit them and effluent was just being dumped into the Lagoon, raw sewage practically; it was  
a lot of courage for the Commission to step forward in so many things they will probably never  
get the due credit, but the Commission of the early 80s and late 70s really had a great  
Wastewater Director, as the County has now, great staff and a lot of capability, they had a  
Federal gun pointed at their head, but they stepped up and had to do a rate adjustment; the  
public hearings were so large, they had to find all the largest churches they could find because  
they could not fit people into any of the public meetings; it was the issue of the day; but they  
had laid the groundwork for so much of what has got the County to this point now, and the  
prosperity that they have now was based on what they did. He went on to say history does  
repeat itself, the County is going to be faced with some challenges here, and he appreciates  
that; the good news, it sounds like there is a little lead time; what he is trying to get is where are  
the decisions points; he asked if there are a set of benchmarks that the Board needs to act and  
react; he mentioned he knows staff gives the Board those that the Board does not catch itself  
in a situation where it has not thought ahead and addressed those; and he appreciates the  
Board bringing these numbers up, it was real interesting.  
Commissioner Goodson stated he would like to make a motion.  
Chair Altman asked if the Board can take an action being this is a Workshop.  
Attorney Richardson advised the Board cannot take final action at a workshop, it can generally  
give staff direction and ask staff to bring things back for formal action at a future Board  
meeting, and things of that nature.  
Chair Altman asked if Commission Goodson heard that.  
Commissioner Goodson stated he moves to direct staff to evaluate what steps would be  
required to reset the General Fund millage rate to a level that would generate revenue needed  
to address the County’s infrastructure and other critical needs; the evaluation would identify  
these needs and include any analysis that potentially impact property owners; and staff should  
bring this back to the Board at a future meeting to discuss it.  
Attorney Richardson advised that is absolutely direction that the Board could provide staff at  
this Workshop.  
Commissioner Adkinson stated she thought the Board could not take a motion, but she agrees.  
Chair Altman asked if the Board can do a motion, second, and vote on that, it is not taking final  
action but asking staff.  
Attorney Richardson stated the Board can take a motion on directing staff to bring back.  
Commissioner Adkinson seconded the motion.  
Commissioner Feltner asked for clarification in resetting the millage to what, a critical funding  
need.  
Commissioner Goodson stated it would be to reset the millage to handle the critical needs.  
Commissioner Feltner asked if that is to exceed the Charter Cap.  
Attorney Richardson stated he is hearing that it is direction for staff to do an evaluation and  
analysis of where the millage would need to be reset in order to fund critical needs and then the  
Commissioner listed off things to be included in that analysis.  
Mr. Liesenfelt stated he is with Attorney Richardson; and what he is hearing and understanding  
is to address the critical needs, and come back with the categories or list of critical needs for  
the Board, what the cost would be, what the millage would be to generate the revenue to offset  
the costs.  
Commissioner Feltner stated also to clarify, the Board is not even voting for a tentative millage  
until July.  
Mr. Liesenfelt stated that is correct.  
Commissioner Feltner stated the Board can decide that at the end of June for a July meeting;  
or it can give direction today to start preparing those things; but ultimately the Board is not  
voting for any of that until July.  
Attorney Richardson responded affirmatively; and he mentioned this would not be action today,  
it would be direction; otherwise, staff will prepare a budget that is within the limits set forth in  
the Charter.  
Commissioner Feltner stated so there are going to be two budgets prepared for the Board; he  
asked if staff is going to go in the direction of, if there is no critical funding need this is what fits  
within the Charter Cap; and if there is a Critical funding need from the Board, then this is the  
budget.  
Jill Hayes, Assistant County Manager, stated her understanding of the request was that staff  
would be coming back to the Board with an evaluation of what those critical needs are and  
what that millage would need to be set at; and she thinks staff would try to do that before it  
brought the proposed budget to the Board in July, and receive additional direction at that time.  
Mr. Liesenfelt stated the Board has asked for a third Workshop; that is what staff can target to  
bring that back for; it has been penciled in but has not been placed on the calendar or asked  
officially, but there could be a third Budget Workshop, after the second meeting in April; it  
would be the same day; there is a Board meeting, hopefully finish up around noon, and come  
upstairs around 1:00 p.m.; and he believes the date is Tuesday, April 21, 2026.  
Chair Altman asked if that would give staff time to meet the motion.  
Mr. Liesenfelt replied he will have to sit down with the County Attorney’s Office and the Budget  
office; what he is picturing is something to bring back to the Board to look at and for the Board  
to say yes or no to start proceeding with developing a final critical need that way staff can  
present it to the Board with the budget on July; and he is making something up, so if staff  
decides to build a four-story in Viera and it is put on as a critical need, and it is presented in  
April, then the Board says it does not want that in the budget, but if staff comes back and says  
it needs to fix $10 million in elevators and the Board agrees with it, then that is what gets  
placed in the budget.  
Chair Altman stated that is an extremely good motion; the Board members have all been  
briefed by staff; it has been difficult because the need for direction; he appreciates that motion  
and thinks it was well thought out; and he will support it.  
The Board reached consensus to direct staff to evaluate what steps would be required to reset  
the General Fund millage rate to a level that would generate the revenue needed to address  
the County’s infrastructure and other critical needs, with the evaluation identifying those needs  
and including an analysis of the potential impact to the property owners, and for staff to bring  
back to the Board at a future meeting for discussion; and reached consensus to schedule  
Budget Workshop #3 on April 21, 2026, at 1:00 p.m., following the Regular meeting on April 21,  
2026, at 9:00 a.m., to discuss options.  
Result: APPROVED  
Mover: Tom Goodson  
Seconder: Kim Adkinson  
Ayes: Goodson, Adkinson, Feltner, and Altman  
Nay: Delaney  
BOARD DISCUSSION  
Commissioner Feltner asked if the Board is going to have these options brought back in April.  
Chair Altman replied affirmatively, explaining that the Board is not committed to anything.  
Commissioner Feltner asked if the Board is agreeing to have a workshop in April, and if that is  
part of it.  
Chair Altman replied he is fine with that.  
Commissioner Feltner stated he is fine with it too, but…  
Mr. Liesenfelt stated he is working a little on the fly; what staff will bring back is critical needs  
for the Board to decide on what would be a critical need.  
Commissioner Feltner stated even in the workshop, where it is not a vote, that is some  
direction.  
Mr. Liesenfelt reiterated that would be direction.  
Commissioner Delaney asked if the Board would be able because of the topic of this workshop,  
to possibly be able to do it as an evening workshop so people would be able to be available, as  
far as the public goes.  
Chair Altman commented he does not know if this is intended to be a public hearing like a  
public hearing on the budget, this is workshop, but the Board would not be able to take a final  
action.  
Mr. Liesenfelt stated it would be a workshop; like he said he is doing this on the fly; staff has  
sent a number of items the Board can take a look at; then it could give some direction; and  
then staff could develop a resolution or whatever for critical need and present that as staff  
presents the budget in July.  
Commissioner Feltner stated he is talking about the second regular meeting, so that is a  
morning meeting; if the workshop is following that, naturally 1:00 or 2:00 p.m., by virtue of that  
the Board members are all here.  
Chair Altman explained right, it is a normal meeting at 9:00 a.m.; the Board has that meeting,  
maybe a lunch break, and come back; he agrees with that; he would not support doing it at  
night, he thinks that would be a hardship; and the Board is not going to take formal action, it is  
a workshop and time to consider.  
Commissioner Adkinson stated she would like to discuss the email she sent out on Tuesday  
evening.  
Chair Altman stated absolutely; the Board can vote on the workshop; he has a procedural  
question on that; and he asked would that be advertised as part of the regular meeting that it  
phased into, or does there need to be a time certain for the workshop.  
Mr. Liesenfelt advised he would call it a workshop; Agenda the regular meeting; and then come  
in to a Workshop.  
Chair Altman stated that makes sense; and if the Board ends early it can come in here earlier  
on the workshop.  
Commissioner Adkinson stated probably everyone in the room saw the email she sent out on  
Tuesday evening; she wanted to explain it a little bit to her fellow Commissioners and to staff;  
last year, being new, she felt like she was drinking from a water hose trying to understand this  
budget; she does not feel as though she had a whole lot of input in it to be perfectly honest;  
staff did what staff does which is make it balance because they have to; she feels like she  
wants to participate a little more in that this year, to the best of her ability; therefore, her office  
went through and looked at some non-essential County services. She added all of these  
services matter to someone, multiple someone(s), and they matter to her, but she thinks it is  
important to look at what the Board can because this is not talking about cutting the fat, the  
Board is talking about service cuts here. She went on to say the only way to balance the budget  
is either bring in more money or cut stuff; this is here because she wanted the Commissioners  
to look at some of the things that maybe the County does not have to do; Mr. Liesenfelt said  
“took a haircut last year”, the Commissioner said, “Facing challenges”, and all of that is lovely  
language for the County is in trouble here; everyone has a budget at home that he or she tries  
to balance, doing different things, so while some of them seem mean, which is a couple  
comments she has heard, yes these ones hurt; what she was hoping was maybe the Board  
does not discuss it right now, but it encourages everyone to go to staff and say, “Is this foolish  
thing that Kim brought up possible, or do I or do I not like it” and get staff to weigh in on it a little  
bit; while this Board might not want to put its name to these cuts because they are emotional,  
maybe if everyone tells staff what he or she thinks, what could be supported in full or in part,  
that gives staff some direction when the Board does ask them to start dealing with this budget;  
and if there are Commissioners who overlap in things that they would support reducing, it  
might help staff create some cuts that are needed. She noted that is what her email was meant  
to do, it was not to support getting rid of any of these things, wholly or in part, it was just an  
idea to start talking for real about what some of these cuts could look like.  
Chair Altman stated that was very good input.  
F.1. Jim Liesenfelt, County Manager  
Jim Liesenfelt, County Manager, stated an email went out earlier today from Billy Prasad,  
Planning and Development Director, they have been invited to the LNG workshop; he is calling  
it a workshop, it is an openhouse or workshop at the Canveral Port Authority next Tuesday,  
March 24; they have been asked to be a presenter, and Mr. Prasad will be there presenting;  
one can see the slides that were sent to each Commissioner, which emphasize the process it  
would take if an LNG plant was built on County land; he pointed out that is not County land right  
now, it is Port land; is somehow the Port decided to sell it to the folks to build an LNG plant,  
there is a long process they would have to go through to get it permitted or allowed in the  
County; and Mr. Prasad will explain that and part of the process is explain to the citizens that  
there will be a number of chances for the citizens to speak up or have public input if that plant  
happened to be proposed on County land. He went on to say since it was just worked on, he  
had the chance to discuss it in public; he just wanted to make sure that it is out there; and he is  
sure Mr. Prasad will do a very nice job representing the County and explaining the process.  
Chair Altman commented he assumes what that means is if that transfer were to become  
reality, it becomes County land, and they wanted to put an LNG plant, they would have to do  
things like Comp Plan amendments and zoning requests; and he asked if that is correct.  
Tad Calkins, Assistant County Manager, replied yes, sir they would have to do a Comp Plan  
amendment, zoning, and they would have to go through the site plan process and meet the  
County Code.  
Morris Richardson, County Attorney, stated and the Comprehensive Plan Amendment would  
not just be a Future Land Use Map (FLUM), they would also require a text amendment to the  
Comp plan.  
Mr. Liesenfelt advised it would not be an easy process.  
Chair Altman asked if there needs to be a vote.  
Mr. Liesenfelt advised no, he just wanted to let the Board know so it is aware, and it gave him a  
chance to speak a little bit on the floor to the public.  
Chair Altman asked if Commissioner Goodson was okay with that since it was his District.  
Commissioner Goodson responded affirmatively.  
F.3. Katie Delaney, Commissioner District 1  
Commissioner Delaney stated she just wanted to thank the Board for letting her participate  
remotely today.  
F.6. Rob Feltner, Commissioner District 4  
Commissioner Feltner stated Brevard Zoo ranked as the fifth best zoo in the nation, in the USA  
Today 10 Best Readers Choice Awards; he congratulated the Zoo saying it is a beautiful time  
of the year, if anyone gets a chance to get out and see the animals; and it is a wonderful thing  
to have one of the best zoos in the country right here in Brevard County, and congratulations to  
them.  
Chair Altman stated it is a phenomenal zoo, it is great; and he learned something when he was  
there just a week or two ago, that Giraffes love to eat Brazilian peppers; he watched them and  
they just devoured them; and yes, do they need to introduce Giraffes into Brevard’s native  
habitat.  
Adjourn  
Upon consensus of the Board, the meeting adjourned at 2:20 p.m.  
ATTEST:  
_________________________  
RACHEL M. SADOFF, CLERK  
__________________________________  
THAD ALTMAN, CHAIR  
BOARD OF COUNTY COMMISSIONERS  
BREVARD COUNTY, FLORIDA