the money but they are still about $800,000 short; they also have their own MSTU so it comes
out of their own budget; and as he points out, many of these MSTUs are also operating under
the cap, they cannot just decide to raise the MSTU by $800,000 to fund it, they have to stay
within the Charter Cap. He noted Road and Bridge, there is a slide about their maintenance,
drainage, and everything that is needed, but Road and Bridge also needs to make sure their
maintenance shops are well-maintained and put together; a few years ago they put funding
together to do a needs assessment and one can see there is over $25 million in upgrades,
replacement fixing that they have to do of the maintenance facilities and that is just the three of
them that one can see listed on the slide; they are working pretty hard on the Melbourne
Central Fleet, he calls it CEP because that is what it was called when he got to the County;
there is about $40 million in needs and $23 million of it funded; they are actively working on it
right now, but still $17 million short; and this is to help the crews that go out and help the
people, they go out and fix the drainage and the roadways, so they need to make sure they are
operating in good facilities. He stated Information Technology (IT) one may not think of it as
infrastructure but definitely to him, it is the backbone of everything that is put together; there
has been heightened awareness of security attacks going on; he knows of one place that was
attacked and their system was brought down, so staff always tries to keep an eye on everything
and stay up-to-date; this last year they were able to fund their Department with existing funds;
one can see looking at the bold parts, they are having to replace the network connectivities, the
switches, the firewalls, and keep everything up-to-date, that is going to cost about $80,000 per
year; when looking at the systems with all the servers and the infrastructure with the servers,
beginning in 2029 they are looking at $350,000; all the storage, once again more equipment,
they are looking at $400,000 per year, so basically looking at $400,000 and $500,000 per year
of IT starting in 2027; this chart has been seen before, it was put together by Utilities; on the
next slide there is a number of wastewater and water plants that the County has to bring online,
upgrade to make sure the County meets all the new regulations; based on the revenue one can
see the costs are going to exceed the existing revenue; this is a list of them all, literally from
Mims down to the South Beaches, Port St. John, South Brevard, Sykes Creek, Port St. John or
new regional plant; their needs are going to be over $865 million, and right now they have
about $71 million funded and that does not mean they are not moving forward with the projects;
they have $793 million of unfunded needs; Eddie Fontanin, Utility Services Director, his crew,
and the County lobbyists, both Federal and State have been really good to help them with
getting grants going through, so they will stay active with the grants; at some point they will be
issuing debt to build some of the plants and facilities; the Board will see them coming back to
talk about connection fee adjustments and user fee adjustments as the studies go along and
they know what they need to do to meet the funding gap; right now analysis and studies are
ongoing and Utilities has a deadline of 2032 to meet all these regulations; and some of this
stuff is occurring, even without capacity needs, that staff has to make sure to have the
upgrades. He noted Solid Waste, and he looks at them both as partners because they are kind
of working similarly, they have to expand their capacity; the new Solid Waste facility on 192, the
first part is funded at about $35 million and part two is still unfunded, but they will be looking at
some kind of debt financing for that; the Titusville transfer station is currently under
construction and it is funded with bonds and commercial paper, that is what the CP is; that
should be completed by July which is good news for Tom Mulligan, Solid Waste Management
Director, and his crew; cell three at the Central Disposal facilities is funded right now with some
commercial paper, but they still have $31 million to go to complete that; to help funding sources
for that is right there at the fund disposal assessment adjustments, debt issue, gate charges,
impact fees, and they all have studies going on to show the costs because if they have to issue
debt they have to justify what they need with debt; while it is not super directly connected, the
Board will probably see in the next month or two staff talking or speaking with Waste
Management as their contract is up next year; there is a chance for extension but one will see
them talking about rates and collection, so that is just a heads up there; and this is his favorite
infrastructure slide because he does not know if people think beaches are infrastructure, but
this is Brevard County and it is extremely important to Brevard County, to the tourism, to the